HPW defended the engineer of record against “bet the company” level allegations of cost overruns, delays and acceleration damages arising out of the steel design of a stadium. The case involved standard of care on a fast track project, responsibility for complex connection design and causation issues related to concurrent delays. As a result of extensive factual and forensic analysis and use of top tier experts,resolution was achieved well within policy limits and exponentially lower than the quarter of a billion sought by the plaintiff.